• Super Dry, Stay Dry, Dimensionally Stable Lumber (pre-shrunk with moisture repellant)
  • Flame Retardant Resistance via low pressure vacuum tank treatment process
  • Precision Engineered and CNC Machined Solid Sawn Lumber detailing

ULTRA Joist

IWS Research, development and support by:

  • Using ULTRAjoist 40ft long lumber, build a 3 story factory shear wall sheathed in IWS FASTBoard engineered building board
  • For Mid-Rise 6 story construction, offset the 3 story panels for even more racking robustness

LimTek Solutions Inc.

Mid-Rise Six Story Wood Construction Requirements:

  • a factory built lightweight wall system that can be hoisted and easily assembled site

  • a wall system that facilitates easy rough-ins for all associated trades and services
  • a wall system that can help abbreviate the construction schedule


Engineered Building Board - FASTBoard - a proven new and innovative engineered building board with passive fire resistance and shear resistance during the course of construction and beyond!

ULTRAJoist by Intelligent Wood Systems:

Dave Cleverley

Intelligent Wood Systems

Glenalmond Timber

Station Road

Methven

Perthshire PH1 3QF

Scotland  U.K.

Tel: +44 1738 840258

Email:  djc@IntelligentWoodSystems.com

http://www.intelligentwoodsystems.com

North American Agent for IWS:

Edmond Lim, P.Eng.

LimTek Solutions Inc.

8 - 9251 Yonge Street, Unit #585

Richmond Hill, ON  L4C 9V6

CANADA

Tel:  416-888-4457

Email:  Edmond.Lim@LimTekSolutions.com

http://www.limteksolutions.com/